Avada includes 3 different styles of recent work shortcodes that allow you to display your portfolio posts on any page you wish. Use a carousel, grid, or grid with excerpts. All styles can specify a certain category and number of posts. Both the grid and grid with excerpts can also use 1-4 columns and show filters.

Recent Work Carousel

Recent Work Grid

Telus Sky tower - HC Matcon
HCM Group - Sage Condominiums: Phase II
HCM Group - K2 Condominiums
65 Lillian Street Condominium Building
HC Matcon - Twinning of the West Trunk Sanitary Sewer
St. Catharine’s Exit Shaft

Recent Work Grid With Filters

Telus Sky tower - HC Matcon
HCM Group - Sage Condominiums: Phase II
HCM Group - K2 Condominiums
65 Lillian Street Condominium Building
HC Matcon - Twinning of the West Trunk Sanitary Sewer
St. Catharine’s Exit Shaft
Dufferin Mall

Recent Work Grid With Excerpts

Telus Sky tower - HC Matcon

Telus Sky tower

,

The Telus Sky tower will be the 3rd tallest building in Calgary with the deepest basement excavation in western Canada. HCM Group took on the challenge of creating a shoring system suitable for the 30m

HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

The Sage Condominium in Waterloo required an innovative shoring system that could facilitate a 10 meter foundation depth while working within encroachment restrictions. HCM implemented a soldier pile and shotcrete shoring system which utilized a

HCM Group - K2 Condominiums

K2 Condominiums

This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging shoring system with rakers to reach depths

65 Lillian Street Condominium Building

65 Lillian Street Condominium Building

Value Engineering Work on this jobsite included the excavation support system for a new condominium building located on 65 Lillian Street in Toronto, Ontario. HC Matcon used soldier piles and shotcrete lagging shoring (SPLS) with

Recent Work Grid With Excerpts And Filters

Telus Sky tower - HC Matcon

Telus Sky tower

,

The Telus Sky tower will be the 3rd tallest building in Calgary with the deepest basement excavation in western Canada. HCM Group took on the challenge of creating a shoring system suitable for the 30m

HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

The Sage Condominium in Waterloo required an innovative shoring system that could facilitate a 10 meter foundation depth while working within encroachment restrictions. HCM implemented a soldier pile and shotcrete shoring system which utilized a

HCM Group - K2 Condominiums

K2 Condominiums

This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging shoring system with rakers to reach depths

Features and Customizations

  • 3 design styles; carousel, grid, grid with excerpts
  • Use filters and set 1-4 column width with grid and grid with excerpt style
  • Specify the number of posts, and the category for all styles
  • Unlimited use per page