Love Condos

Love Condos

,

This project involved approx 41,000 sf of piles and lagging temporary shoring system. The project was broken into two phase both consisting of piles and lagging with both rakers and tiebacks in order to avoid conflicts with neighboring properties. HCM along with RWH design and constructed the shoring system to meet the project scheduled and

London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and was (on average) 10m in height. The first day, Matcon placed a scratch coat at 0.400m thick, and then a surface coat at .050m thick

Milton Grade Separation

Milton Grade Separation

,

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario

St. Thomas Courthouse

St. Thomas Courthouse

,

Alternate Methods Stop Running Sands HCM was retained to design, supply and install a complete shoring system to facilitate construction of the new St. Thomas Court House for EllisDon. Construction of the proposed shoring was initially for soldier piles and lagging with a single level of bracing using tiebacks. The existing structures were initially designed

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM mobilized 5 large diameter drill rigs and in seven and a half weeks installed 311 soldier piles (12,000 linear feet) drilled into bedrock up to

Bluwater Condominiums

Bluwater Condominiums

The Pemberton Group is adding the luxury waterfront Bluwater Condominiums to its portfolio. The 22,000 SF area of shoring area will accommodate the construction of three eight-story buildings on the banks of Lake Ontario. The job was tendered with numerous systems; soldier pile and lagging, caisson wall and shotcrete shoring. The excavation depth was 7.5m

CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms. HC Matcon's scope of work, includes: 37 caissons at 30-inch diameter, and an approximately 25-foot deep shoring system with strand anchors. The pile and caisson

Credit Valley Hospital

Credit Valley Hospital

,

Alternative to Save Time and Money The Credit Valley Hospital in Mississauga, Ontario is undergoing a massive expansion and renovation. HC Matcon was brought in to undertake the shoring, underpinning, and caissons for this construction. The majority of the work included the drilling and installation of 222 concrete caissons, ranging between 24- and 84-inches in

TTC Wilson Complex Modification

TTC Wilson Complex Modification

, , ,

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson wall, soldier piles and lagging, and conventional concrete underpinning for the earthwork specifications related to our field of work. HC Matcon proposed an alternative engineered

St. Joseph's Healthcare Redevelopment Project

St. Joseph’s Healthcare Redevelopment Project

, , ,

Unique Soil Conditions The future location for this tower is located immediately adjacent to the emergency wing of the existing St. Joseph's hospital in Hamilton, Ontario. HCM is a recognized shoring contractor that will take on many challenges relating to foundation design. On this particular project, HCM took on the tasks of: shotcrete shoring caissons